Road base calculator for Utah

Figure lane and pad quantities at finished depth, since a difference of a few inches can add ten tons to an order.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

At 100 feet long and 10 feet wide, a lane built to 6 inches compacted takes about 31 tons of road base. Long runs can use more aggregate than expected, making free delivery especially useful when 30 tons of freight can nearly match the material cost. Road base is graded crushed stone with fines, about 3,000 lb per cubic yard, which compacts into a dense foundation for equipment yards, driveways, and roads. Recycled crushed concrete base follows the same calculation when the specification permits it.

Lane quantities

  1. For lanes, take the length along the center and calculate from the average width. Pad area is simply length multiplied by width.
  2. For light residential areas, compact to 4 inches. Use 6 for daily traffic and delivery trucks, or 8-12 where subgrades are soft or equipment will sit.
  3. Take cubic feet ÷ 27 to find yards; multiply by 1.5 for tons; include +10% for compaction.
Tons = (Length ft × Width ft × Depth in ÷ 12) ÷ 27 × 1.5 × 1.10
Quick figure: one ton ≈ 36 sq ft at 6" compacted

Coverage and lane quantities

Compacted depth1 ton coversTons per 100 ft of 10-ft lane
4 inches≈ 54 sq ft20.4
6 inches≈ 36 sq ft30.6
8 inches≈ 27 sq ft40.7
12 inches≈ 18 sq ft61.1

Build a lane for the next winter

  • Remove organic material before placing stone. If base goes over topsoil, mud can push up through it regardless of how much stone is added.
  • Lay woven geotextile first on wet or soft subgrade, then add stone. It adds support beneath a lane at low cost.
  • Place and roll lifts no deeper than 4 inches before adding the next layer.
  • Build in a 2-3% slope from the center toward both sides, allowing rain to run off at the edges rather than enter the base.
  • For a tidy, lower-dust driving surface, finish with #57 or driveway gravel.
  • Handling 20-plus tons by hand can consume a week. With a tractor box blade or skid steer, the spreading can take an afternoon, so include the machine in your budget.

Example: a 100-foot farm lane

For one hundred by ten feet at 6 inches, 1,000 x 0.5 = 500 cubic feet = 18.5 cubic yards, about 28 tons, or 30-31 after the allowance. It comes in two tandem loads, so arrange two unloading spots along the route instead of leaving one pile at the entrance. Farm lanes tend to create the largest typical calculator orders, and using two drops avoids moving material uphill after spreading it downhill.

Equipment, container, and RV pads

Use the same method for pads, but choose depth based on axle weight rather than the calendar. An RV pad measuring 12 x 40 at 6 inches compacted takes about 12 tons. An equipment yard at 20 x 40 and 8 inches takes 27 tons. Because shipping containers place their load on four corners, use a full 8 inches plus fabric for container pads, even where ground seems decent, to limit settling by spring.

Crushed concrete road base

Recycled concrete base can compact and handle loads about as well as virgin road base, often at a lower cost. Check county specifications before making the change, since some call for virgin aggregate. It is a practical choice for private lanes and pads. Use the same math: 1.5 tons per yard, identical lifts, and the same crown.

Road base by ton or lane

How can I calculate the road base I need?
Start with length, width, and compacted depth in feet. Divide their product by 27 to get yards, multiply by 1.5 for tons, then add 10% for compaction. That allowance is already included in the calculator above.
What coverage comes from 1 ton of road base?
At 4 inches compacted, expect about 54 square feet; at 6 inches, about 36 square feet.
What does 1 yd of road base weigh?
One loose yard is roughly 3,000 lb, or 1.5 tons, and occupies less space after it is rolled. A tandem truck hauls about 10 yards, or 15 tons, on a trip.
What road base depth should a driveway have?
For light traffic on firm ground, use four inches compacted. Use six for routine driving and delivery trucks. Use eight to twelve on clay, damp ground, or equipment parking. Increase depth before width because insufficient base thickness fails first.
Road base compared with crusher run
Road base and crusher run do similar work, but their stone sizes differ. Road base uses a coarser top stone for supporting loads, while crusher run is finer for smoother screeding. Choose road base for lanes and yards, and crusher run for paver bases or close grading. For a standard driveway, compare prices.
Is fabric needed beneath road base?
Firm, well-drained subgrade does not need it. Use woven geotextile on clay, including Lake Bonneville clay, or where ruts appear. Placed between stone and soil, it reduces mixing and can cut the stone a lane needs over a decade by half.

Thirty tons with no delivery fees.

Road base is priced by the ton and includes free hauling on lane-size orders, where delivery is often the largest cost.

Shop Road Base

Schedule aggregate from these figures