Skip to main content
FREE Delivery!|(385) 360-1334

Rip rap calculator for Utah

Calculate stone for slopes and shorelines using armor-course depth rather than ordinary landscape depth.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

Plan on about 17 square feet of coverage from one ton of riprap. Armor stone is installed in layers of 12 inches or more, unlike landscape rock spread in a shallow layer, so the pile can look modest before it is placed. This rip rap calculator accounts for layer depth, using 3,100 lb per cubic yard for rock commonly sized 4 to 12 inches and larger.

How to measure an armored bank

  1. Run your tape along the bank face rather than across the level ground, then multiply that distance by the shoreline or channel length.
  2. Set the rock layer at 1.5 to 2 times the largest stone dimension. For active erosion control, use no less than 12 inches.
  3. To find tons, divide cubic feet by 27 and multiply the result by 1.55.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Tons of coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

Stone placement basics

  • Start with fabric or bedding: place non-woven geotextile beneath the riprap, or use 3-4 inches of #4 stone. Rock set directly on soil can look acceptable at first, but the bank may slump when water removes soil below it.
  • Start by setting the toe. Place the lowest course below the waterline or the expected scour depth, since undermining begins at the base.
  • Shape the bank to 2:1 or flatter before placing the stone. If the face is steeper, it calls for engineering rather than extra rock.
  • Machine-place or hand-place the exposed upper stones so they lock together, instead of leaving them where they land.
  • For culvert outlets, extend the apron 4-6 pipe diameters past the discharge point downstream, where water can scour the ground.

Example: 50 feet of pond bank

A shoreline length of 50 feet with a 6-foot bank face equals 300 square feet. For an 18-inch layer, calculate 300 x 1.5 = 450 cubic feet = 16.7 cubic yards. That is about 26 tons of riprap, or 27 including the small allowance. Install a roll of geotextile, or use about 4 tons of #4 stone as rock bedding. Before ordering, check the truck path, especially the last 20 feet to a pond edge where loaded vehicles may lose traction. Rehandling stone doubles the cost.

Check after the first major storm

After the water recedes, make one pass along the bank. Check the toe for displaced rock, exposed soil in the gaps, or fabric visible beneath the stone. Put shifted pieces back, use reserve stone to fill sparse areas, and inspect the outfall apron for erosion. Ten minutes of review a couple of times a year covers the maintenance: riprap is intended to protect the bank with little ongoing work.

A quick guide to size classes

Base the rock size on the water's force. Four to eight inch riprap works for pond banks, downspout outlets, and slow-moving streams. Eight to twelve is suited to lake edges with boat wake and quicker channels. Highway and spillway projects have engineered stone classes and layer depths, so follow the project drawing instead of this page. If deciding between two sizes, choose the larger material and increase layer depth. Heavier rock tolerates more force.

Riprap sizing, tonnage and placement

How can I estimate the rip rap I need?
Take the slope-face area, multiply it by the layer thickness in feet, divide by 27, then multiply by 1.55. For a 10 x 10 sample section at 12 inches, the result is 37 cubic feet, or about 2.1 tons.
How much does 1 ton of riprap cover?
At a 12-inch layer, a ton covers roughly 17 square feet; at 18 inches, it covers 12. For budgeting at the standard depth, use 5.5 to 6 tons for each 100 square feet.
What size pile is 1 ton of rip rap?
One ton forms a pile of roughly two-thirds of a cubic yard, about the volume of a washing machine. With 6-8 inch rock, that is typically 25-35 stones. At full depth, the material spreads over a 4 x 4 section of bank.
What is the cost of 1 ton of rip rap?
RipRap is priced by size class, above construction stone; current pricing appears on our RipRap product page, and delivery is free. Fabric and bedding stone add a fraction more, and both belong beneath the rock layer.
What layer depth should rip rap have?
Use a course one and a half to two times the largest rock dimension, never less than 12 inches. Standard residential 4-12 inch material generally needs 12-18 inches, while larger rock or quicker water may call for 24.
Is hand placement possible for rip rap?
For stone up to about 6-8 inch, hand placement is possible with gloves and a strong back, though a ton means 25-35 lifts. Larger rock calls for equipment. A skid steer can place in an hour what hand placement takes a day.

Plan erosion protection for exposed banks.

Buy RipRap by the ton with free delivery, with #4 bedding stone for beneath the armor rock.

Shop RipRap

Schedule aggregate from these figures